RBS Library: Operation and Maintenance -> Fault Management -> Alarms ->IMA
Link Insufficient Links
This alarm is
triggered when one or more of the IMA links have failed. This reduces the
number of IMA Links in the IMA group and the “required number of links” is less
than defined.
RBS:
moshell
Uxxxx *log onto the node
alt
*show current alarms – this will indicate what E1/IMA Link the alarm has been
triggered for
st
pp *shows the status of the E1s on the site
st
ima *shows the status of the IMA links
get
ima *shows what IMA Link is associated with a particular E1
get
ima required *shows the required number of links needed in the IMA group
CASE 1:
In the below example there are two UNLOCKED
and ENABLED E1 links. However there is only 1 E1 link defined in the IMA group.
NG5188>
st pp
100730-12:08:56
10.202.83.113 8.0c RBS_NODE_MODEL_M_1_8 stopfile=/tmp/29260
===================================================================================
===================================================================================
110 1
(UNLOCKED) 1 (ENABLED)
Equipment=1,Subrack=1,Slot=1,PlugInUnit=1,Cbu=1,ExchangeTerminal=1,E1PhysPathTerm=pp1
111 0
(LOCKED) 0 (DISABLED)
Equipment=1,Subrack=1,Slot=1,PlugInUnit=1,Cbu=1,ExchangeTerminal=1,E1PhysPathTerm=pp2
114 1
(UNLOCKED) 1 (ENABLED)
Equipment=1,Subrack=1,Slot=1,PlugInUnit=1,Cbu=1,ExchangeTerminal=1,E1PhysPathTerm=pp3
===================================================================================
NG5188>
st ima
100730-12:09:02
10.202.83.113 8.0c RBS_NODE_MODEL_M_1_8 stopfile=/tmp/29260
===================================================================================
===================================================================================
17 0 (DISABLED) TransportNetwork=1,AtmPort=1-1-ima1
49 0 (DISABLED) TransportNetwork=1,ImaGroup=1-1-ima1
50 1 (ENABLED)
TransportNetwork=1,ImaGroup=1-1-ima1,ImaLink=1
===================================================================================
NG5188>
get ima required
100730-12:22:21
10.202.83.113 8.0c RBS_NODE_MODEL_M_1_8 stopfile=/tmp/29260
===================================================================================
MO
Attribute Value
===================================================================================
ImaGroup=1-1-ima1
requiredNumberOfLinks 1
===================================================================================
Check on the HS 3G Site planning page to confirm
the number of links that are actually completed on site.
In the above example BSS will be required
to do an IMA upgrade and add the 2nd working link to the IMA group.
You might also need to contact Transmission and confirm what the correct
configuration is on the DXX.